We run a seating factory in İnegöl. Our own building, 30+ staff, 250 sets a month, and every order inspected here before it is loaded.
When a volume exceeds what one line can absorb we run it through our partner network in the same cluster. Bulk seating orders keep the same 25–30 day window either way.
Contract & project supplyHotel lobbies, restaurant lounges and reception areas. Ordered against one specification and called off as sites open.
Offices, waiting areas and co-working floors. Repeat volumes with the same frame and fabric each time.
Seating companies and importers carrying lounge as a category alongside their sofa range.
Yes. Lounge furniture wholesale runs on our standard trade terms: flexible minimum order agreed per order, mixed models in one load, 25–30 days production and 30% deposit with 70% before shipment. Buyers fitting several sites usually order against one specification and call the volume off in stages.
A seating manufacturer. Our own facility in İnegöl produces 250 sets a month with 30+ employees, and we extend capacity through more than ten curated partner factories in the same cluster. Every order is inspected in-house before it ships.
Yes. Bulk seating for hotels, restaurants and commercial spaces goes through the partner network without a change in the 25–30 day lead time. Tell us the piece count, the specification and the delivery window and we quote against it.
This page covers lounge and seating supply as a product category: models, terms and volumes. Our contract page covers project work: specification-led production for a named fit-out, phased delivery and held specifications between phases.
Yes. Lounge furniture brands under the Pouf name, and production for importers and contractors selling under their own. Own-brand labelling needs a minimum order per product, agreed before production.
Contract buyers ask for these first. Foam density and Martindale rating decide how a seat holds up after two years in a lobby.